Construction
Apr. 26, 2001
Direct Pipeline
In April 1999, my firm was brought in as plaintiffs' trial counsel in a construction defect case involving the manufacture, installation and use of galvanized steel pipes for the potable water system in a housing development. These pipes corroded prematurely, causing brown water, pinhole leaks and stained fixtures.
Paul R. Kiesel
Partner Kiesel Law LLP
8648 Wilshire Blvd
Beverly Hills , CA 90211
Phone: (310) 854-4444
Fax: (310) 854-0812
Email: Kiesel@kiesel.law
In April 1999, my firm was brought in as plaintiffs' trial counsel in a construction defect case involving the manufacture, installation and use of galvanized steel pipes for the potable water system in a housing development. These pipes corroded prematurely, causing brown water, pinhole leaks and s...
For only $95 a month (the price of 2 article purchases)
Receive unlimited article access and full access to our archives,
Daily Appellate Report, award winning columns, and our
Verdicts and Settlements.
Or
$795 for an entire year!
Or access this article for $45
(Purchase provides 7-day access to this article. Printing, posting or downloading is not allowed.)
Already a subscriber?
Sign In